ST LAURENCE CHORLEY
ARCHITECTS PRACTICE – JOHN COWARD
CLIENT – P.C.C
CONTRACT SUM – £444’000.00
CONTRACT PERIOD – 28 WEEKS
THE WORKS CONSIST OF ERECTING A TEMPORARY ROOF OVER THE FULL CHURCH, STRIPPING THE 2NO CENTRAL VALLEYS CARRYING OUT STRUCTURAL TIMBER REPAIRS THEN REFORMING TIMBER GUTTER BOTTOMS TO CORRECT FALLS FORMING NEW LEAD GUTTER TO BOTH CENTRAL VALLEYS.
REPOINTING OF GABLES AND COPING STONES.
DISMANTLING OF EXISTING KITCHEN CONSTRUCTING NEW KITCHEN WITH A FULLY EQUIPT COMMERCIAL KITCHEN WHICH INCLUDES A SERVERY WITH A FIRE RATES ROLLER SHUTTER LINKED TO THE FIRE ALARM.
AN UPGRADE OF ELECTRICS AND FIRE DETECTION.
THE INSTALLATION OF A COMMERCIAL EXTRACTION SYSTEM.