Liverpool Cathedral ASHP

ARCHITECTS PRACTICE – JOHN COWARD
CLIENT – LIVERPOOL CATHEDRAL A.S.H.P
CONTRACT SUM – £116’000.00
CONTRACT PERIOD – 10 WEEKS
THE WORKS ARE TO INSTALL AN AIR SOURCE HEAT PUMP TO RUN THE UNDERFLOOR HEATING TO THE WELL.

LIMESTONE TILES TO THE NORTH AISLE FLOOR AND STEPS ARE TO BE LIFTED TO ALLOW THE CONCRETE SUB FLOOR TO BE CUT THROUGH TO FORM A DUCT TO ALLOW THE NEW PIPEWORK TO BE INSTALLED, NEW HOPTONWOOD TILES AND STEPS TO BE LAID.

CONCRETE BASE TO BE FORMED WITH DRAINAGE CHANNELS FOR THE AIR SOURCE HEAT PUMP